Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online more than two weeks ago
Candidate
Male, 52 years, born on 20 February 1973
Aleksin, I want to relocate (Moscow), prepared for business trips
Frac Coordinator
650 $ in hand
Specializations:
- Sales manager, account manager
Employment: full time, part time, project work
Work schedule: full day, shift schedule, flexible schedule, remote working
Work experience 30 years 9 months
June 2015 — currently
9 years 10 months
SCHLUMBERGER
Oil and Gas... Show more
FIELD SUPERVISOR 3 QA/QC FRACTURING,STIMULATION,CEMENTING AND SAND CONTROL
Duties/Responsibilities: As Supervisor my responsibility is to do works FRACTURING ( Massive Fracturing to 14.000 PSI , Fracturing HPHT with THERMA FRAC fluids, 60 BPM, Hi WAY ) H2S wells, Horizontal wells,Rig less, Supervising equipment’s of Fracturing and Stimulation ( PCM, SUPER POD AND PUMPS )
STIMULATION Operations (Acid Frac, Acid Stimulation to high Rate, Some fluids used :RMA, DAD, OilMAX ,DIX, Acid-Frac , Clean Sweet, OCA,, Stimulation trough coiled tubing and Data acquisition with StimCAT ),Rig less).
ARAMCO Company
November 2014 — December 2014
2 months
Oman, www.slb.com/
Oil and Gas... Show more
Field supervior 3 Fracturing and Cementing
: As High pressure Supervisor and low pressure Supervisor my responsibility is to do works FRACTURING ( Massive Fracturing to 13.000 PSI , Fracturing HPHT , 60 BPM, Hi WAY ) H2S wells, Rig less ( PCM, SUPER POD AND FRAC PUMPS )
Operations in BP Exploration.
BP EXPLORATION. AND PDO
June 2014 — October 2014
5 months
Kingdom of Saudi Arabia, www.slb.com/
Oil and Gas... Show more
Field Supervisor 3 Fracturing and Stimulation
As Supervisor my responsibility is to do works FRACTURING ( Massive Fracturing to 14.000 PSI , Fracturing HPHT with THERMA FRAC fluids, 60 BPM, Hi WAY ) H2S wells, Rig less, Supervising equipment’s of Fracturing and Stimulation ( PCM, SUPER POD AND FRAC PUMPS )
STIMULATION Operations (Acid Frac, Acid Stimulation to high Rate).
ARAMCO Company
November 2005 — May 2014
8 years 7 months
Moscow, www.slb.com/
Oil and Gas... Show more
Field supervisor 3 Fracturing,Stimulation,Cementing and Sand Control
As Field Supervisor my responsibility is supervising the day to day STIMULATION Operations ( RMA, DAD, OilMAX ,DIX, Acid-Frac , Clean Sweet, OCA, Acid Matrix, Stimulation trough coiled tubing and Data acquisition with StimCAT ) ,FRACTURING ( Massive Fracturing to 17.000 PSI , Hi-way , Fracturing with Foam and Oil, Abrasic FRAC and Data acquisition with FracCAT ), SAND CONTROL ( Stim Pack, IsoAllPack, High Rate Water Pack , Horizontal Open Hole Gravel Pack , Open Hole Gravel Pack , Single Gravel pack, perm PACK control excessive water cuts ( Aqua-PAC, FraCON ), we have performed work through Schlumberger or Weatherford completion tools ( QUANTUM) Procedure: Run in hole - Drop setting ball/Set packer - Pull test packer/Blow ball seat – Packer pressure test position – Test reverse - Set down circulate and gravel pack),CEMENTING Operations ( Plug cement, Casing 20", 13 3/8 , Liner 7", 5" Cementing High temperature, Blend with Micro-Silica, Cementing with Fiber, Cement simulation modeling, cement slurry design for primary, remedial, and abandonment cement jobs, Foam Cementing, Tuned Light Cementing thorough knowledge of lab testing procedures for all aspects of cement slurry design, competitive analysis, tendering, inventory management, service quality reviews across of Coiled Tubing and data acquisition with the program CemCAT ) COILD TUBING (Nitrogeno,Scale Blaster service developed for conveyance on coiled tubing to remove the scale as an alternative to pulling the tubing. The service uses a high-efficiency jetting system for removal of hard deposits,SSV ( Schlumberger tool technology) , Fish of Bridge Plug, Tools as Molino Deep Throat, Molino BJC (Blade Junk Cement) ,Tech Shorty Motorhead Assembly designed to be run above a downhole motor on the end of coiled tubing. Four tools have been assembled into three sub-assemblies, "E-Z" Connector, Double Flapper Check Valve, and Hydraulic)
SLICKLINE (In operation with Slick Line Confirming the well depth or clearance to perforations
Running and pulling plugs or Low control devices Opening and closing sliding side-doors or similar completion equipment Conducting pressure and temperature surveys using mechanical or electrical Gauges and recorders, this we performed before each fracturing operation or stimulations Installing tubing pack-offs or similar completion devices
Logging and perforating Valve Assemblies, Service Tools, Back Pressure Valves, Cameron Type ‘H’ Back-pressure Valve ), with respect to fracture stimulation fluids performing quality tests before each operation to have a good efficiency of the fluid. Including but not limited to: following the well program, modifying it as and if required, ensuring efficient personnel performance, assessing and finding appropriate solutions for any problems during operation, providing regular reports, interacting with any other services on the rig for more productive and efficient and desirable outcome.
During this time I worked on the following rigs:
• CEPCOLSA: HP Drilling , heavy oil and Gas
• CEPCOLSA : Independence 34 Heavy Oil and Gas
• BP: HP Drilling type of well heavy foamy oil
• BP: PARKER, type of well oil. HPHT conditions.
• BP:PRIDE , type of well – oil and Gas
• PACIFIC RUBIALES: SAXON land rig, type of well, heavy oil. 12% H2S
• PACIFIC RUBIALES: SAI land rig High Pressure.
• HOCOL: PRIDE land rig , Horizontal
• HUPECOL: SAI land rig type of well Oil and Gas
• PETROMINERALES: Independence land rig High pressure 10.000 PSI in head
• PETROBRAS: NABORS land rig type of well oil and gas.
• ECOPETROL:PRIDE land rig
January 2000 — October 2005
5 years 10 months
BJ services
Colombia
Oil and Gas... Show more
Operator and Supervisor Fracturing,Stimulation,Cementing and Sand Control
As Operator my responsibility was to do works of Cementing ( Squeeze, Casing 20", 13 3/8 , Liner 7", 5" Cementing High temperature, Cementing with Fiber, Cementing across of Coild Tubing and data acquisition ) Stimulation ( Acids HCL 5% and 28% , Frac-Acids) Fracturing ( Massive Fracturing to 15.000 PSI , Fracturing with Foam and Oil, Abrasic FRAC and Data acquisition ), Sand Control ( High Rate Water Pack , Horizontal Open Hole Gravel Pack , Single Gravel pack ), these jobs done with following equipment’s (RAM, Cementing Pumps, Blender, Hydration Unit FracPumps, SandKing, FracHead, and Frac-Van Monitoring data acquisition), and driver of heavy vehicle. As Field Supervisor my responsibility is supervising the day to day operation on the well of Stimulation, Fracturing, Sand Control, Cementing and Fluids). Including but not limited to: following the well program, modifying it as and if required, ensuring efficient personnel performance, assessing and finding appropriate solutions for any problems during operation, providing regular reports, interacting with any other services on the rig for more productive and efficient and desirable outcome.
During this time I worked on the following rigs:
• BP: HP Drilling type of well heavy foamy oil 17.000 Ft
• BP: PARKER, type of well oil. HPHT conditions.
• BP:PRIDE , type of well – oil and Gas
• BP: NABORS type of well high Pressure 10.000 PSI.
December 1998 — October 1999
11 months
Camco
Colombia
Oil and Gas... Show more
Assistant tools
In This Company I was Assistant of Tools (Setting Tool, Safety Valve) Rig up and testing of these tools.
December 1993 — December 1998
5 years 1 month
Tetra International
Colombia
Oil and Gas... Show more
Senior Operator Filtration
As Operator Senior of Filtration my responsibility was to do works of Filtration in different rigs make change of fluids (Mud for Brine without solids, heavy pills for well control, to mix chemicals for viscous pill in production and perforation) for BP Company. Towards maintenance and reparation to the different equipment’s of Filtration.
• BP: HP Drilling type of well heavy foamy oil 19.000 Ft
• BP: PARKER, type of well oil. HPHT conditions.
• BP:PRIDE , type of well – oil and Gas
• BP: NABORS type of well high Pressure 9.000 PSI
Most of the time I worked in wells of BP Exploration with TETRA International
Skills
Skill proficiency levels
About me
Gym,Soccer
Higher education
1997
Antonio nariño
Risaralda, Industrial Engineer
Languages
Professional development, courses
2014
H2S
ATS, Oil and Gas
2012
RigPass
WCI, Oil and Gas
2011
QHSE 2
Schlumberger, Oil and Gas
2009
SD-1,2 Fracturing and Stimulation
Schlumberger, Oil and Gas
Tests, examinations
2005
Carlos Perez
Schlumberger, Fracturing,Stimulation,Cementing and Sand Control
Citizenship, travel time to work
Citizenship: Colombia, Russia
Permission to work: Argentina, Oman, Russia, UAE
Desired travel time to work: Doesn't matter